aquaecology.group

Cheaper for a comprehensive assessment of the total cost of ownership of an engineering solution.

20 years in the market of Belarus, Russia and Kazakhstan. And that is just the beginning!

Food and processing industry

For enterprises of the processing and food industry, we offer the design, construction or reconstruction of local treatment facilities. We help industries manage wastewater and clean it up to parameters that meet not only local but also international environmental standards.

Our solutions in the field of local treatment facilities allow both to eliminate the use of filtration fields, and to reduce the costs associated with the discharge of wastewater into urban systems. We increase the productivity of urban wastewater treatment plants, help them save electricity and reduce costs, both for the removal of solid residues after wastewater treatment, and for paying environmental taxes for them, launching entire complexes of equipment and selecting reagents for them as part of the reconstruction.

We provide the lowest cost of ownership of an engineering solution by performing the following tasks:

  • improving environmental safety, reducing the burden on the environment: construction / reconstruction of wastewater treatment plants, equipment for wastewater treatment plants (sewage mechanized grids, conveyors, screw presses, panel gates, crushers, mud scrapers, aeration systems, blowers, sewage discharge stations);
  • ensuring high-quality water treatment and water treatment: chemical reagents;
  • water filtration: UV installations for water disinfection and hypochlorite preparation and dosing units, water filtration systems with non-pressure and pressure filters;
  • long-lasting and safe storage of almost any liquid: steel tanks with glass-enamel coating for the storage of drinking water or wastewater;
  • zero liquid discharge technology.

To confirm the feasibility of introducing new equipment and / or technology we perform a simplified feasibility study for internal use with a simple payback period in the following areas:

  1. Modernization of power-consuming equipment.
  2. Modernization of heat-consuming equipment.
  3. Modernization of fuel-consuming equipment.
  4. Modernization of the circulating water supply system.
  5. Modernization of the air supply system.
  6. Construction of a new facility with selection and justification of equipment efficiency.

We are also ready to develop a feasibility study for external use with the involvement of our partners: for example, to justify investments in accordance with a technical and commercial proposal or to confirm the investment attractiveness of the project.

To implement these process steps, we have a full range of appropriate equipment in the
catalog
Authorization
*
*
Registration
*
*
*
*
*
*
*
*
Password generation