References
- Home » About us » References
Menu
Reviews
RUE “Vitsebskenergo”: multi-stage vertical pumps
Minsk CHPP-3 of RUE “Minskenergo”: helamine dosing station
RUE “Vitsebskenergo”: multi-stage vertical pumps
SUMPE “Grodnovodokanal”: equipment for mechanical wastewater treatment
Minsk CHPP-3 of RUE “Minskenergo”: mechanical seals of the pump
CHUE “Mozyr raizhilkomkhoz”: pump unit
CHUE “Mozyr raizhilkomkhoz”: pump unit
JSC “Polotsktransneft Druzhba”: oil sludge pumping unit
Berezovskaya GRES: GRP pipeline
Unitary Enterprise “Gomelvodokanal”: pump unit
JSC “VO” Tyazhpromexport “: a set of equipment and materials for fire water supply and sewerage systems
Municipal company “Mozyrski raizhilkomkhoz”: pumping equipment
Unitary enterprise “Gantsevichi RZHKH”: a set of equipment for sewage treatment facilities
JSC “Mozyr Oil Refinery”: bottom pumps
UMPE “Gomelvodokanal”: equipment for mechanical wastewater treatment
JSC “Mozyr Oil Refinery”: spare parts to the pump unit
Unitary Enterprise “Brestvodokanal”: drain sewage station
JSC “Belaruskali”: mobile diesel engine plant
References
In public utilities sector we would like to mention successful implementation of the projects and winning international tenders, where we competed not only with Belarusian, but also with the leading foreign companies in the frame of such projects as:
- reconstruction of SPS-6 Grodno (2009, about 400,000 euro of EU funding.);
- reconstruction of wastewater treatment facilities in Gantsevichi (2011-2012, approximately 300,000 euro funding from the World Bank loan);
- reconstruction of wastewater treatment facilities in Grodno (2013-2014, about 700,000 euro funding from the John Nurminen Foundation);
- Reconstruction of mechanical sludge dewatering plant in Minsk (2014-2015, about 2 million euro).
Since 2006 ALC Aquaecology started to cooperate with power supply companies.
Significant projects are:
- supply and commissioning of the regulated pump unit with hydraulic coupling in Baranovichi CHP (2009, more than 300,000 euro);
- Supply and commissioning of pumping equipment operation as a part of reconstruction of CHP-3 in Minsk (2007-2008, more than 500 000 euro);
- Circulation pipe systems with a diameter of 800 … 2000 mm. reconstruction of Svetlogorsk CHP (2010-2011., more than 1 million euro), construction of 400 MW combined cycle gas turbine unit at CHP-5 in Minsk (2010-2011., more than 3 million euro), construction of the combined-cycle 400 MW unit at Berezovskaya GRES in collaboration with the Chinese general contractor (2013, 500,000 euro).
Significant international projects of the company are:
- Construction of circulation pipe system at the reconstruction of Novomoskovskaya GRES, Russia (2011, more than 500,000 euro);
- Supply of heat exchanging and pump equipment, equipment and reagents for water treatment at the cast iron production plant in the Republic of the Union of Myanmar (2013-2014, more than 2 million euro);
- Supply of chemicals for seawater desalination plant in Aktau, Kazakhstan (2013-2015, more than 500,000 euro);
- Supply and commissioning of Alfa Laval self-cleaning filters for Karaganda CHP, Kazakhstan (2014, more than 1.2 million euro);
- Supply of chemicals for purification of Taldykol Lake Astana and service support of the project (2014-2015, 1.5 mln euro).